CyberPower UPS preventive maintenance across Canada. Annual and semi-annual contracts that include load testing, battery health checks, firmware review, capacitor inspection and full written service reports. We service the CyberPower UPS line (CP, PR, OR and OL single-phase units and SM three-phase modular systems) with technicians dispatched from our Canadian service hub.
What the service life looks like year by year
Typical program on a unit in a conditioned room. Battery replacement lands in the middle years, capacitors and fans later, with measurements recorded at every visit.
What’s included in a CyberPower preventive maintenance visit
- Visual inspection: chassis, cables, vents, ambient temperature, dust accumulation
- Battery test: internal resistance, voltage under load, runtime simulation
- Load test: verified output capacity at current connected load
- Firmware review: UPS and RMCARD firmware versions, security advisories, update if needed
- Capacitor inspection: visual check on OL online and SM three-phase models
- Self-test & runtime calibration
- Network management card check: RMCARD reachability, traps, SNMP config
- Bypass switch test: for online double-conversion and 3-phase systems
- Written service report: audit-ready, including measurements, recommendations, photos
Contract options
- Annual contract (1 visit/year): recommended for CP, PR and OR units
- Semi-annual contract (2 visits/year): recommended for OL online and SM three-phase systems
- Quarterly contract (4 visits/year): recommended for mission-critical data centers and tender-driven sites
- Custom contracts: for multi-site portfolios or government tenders. See our tender scope-of-work template.
Why CyberPower preventive maintenance matters
The leading cause of UPS-related downtime is failed batteries detected too late. Preventive maintenance catches battery degradation 6 to 12 months before a Replace Battery alarm fires, letting you schedule replacement during a maintenance window instead of during an outage. For OL and SM systems, regular capacitor and PFC inspection extends usable life by 30 to 50% beyond the standard 5-year design horizon.
Coverage
Preventive maintenance dispatched on-site to Toronto, Montreal, Ottawa, Vancouver, Calgary, Edmonton, and to other Canadian cities by appointment. We also offer remote PM consultations for sites where on-site travel doesn’t make economic sense, useful for the diagnostic + recommendations portion of the service.
Frequently asked questions
How much does a CyberPower UPS preventive maintenance contract cost?
Annual contracts for a single CP, PR or OR unit typically run CAD $400 to $700 per year per unit including travel. OL and SM contracts depend on system size and visit frequency, quoted on request. Multi-unit portfolios get volume discounts.
Do you replace batteries during the maintenance visit?
If the battery test indicates failure, yes, we can swap the battery set during the same visit if we have it in stock or scheduled. Otherwise we report findings and schedule a follow-up swap.
Are your reports suitable for ISO/SOC2 audits?
Yes. Reports include date/time, technician name and certification, equipment serial numbers, measurement data, photos and recommendations, all the audit trail elements typically required.